Quantcast

Traffic moving along Don Holt Bridge following accident - Live5News.com | Charleston, SC | News, Weather, Sports

Traffic moving along Don Holt Bridge following accident

Mile Marker 21.5 Westbound at 5:51 p.m.  (Source: SCDOT) Mile Marker 21.5 Westbound at 5:51 p.m. (Source: SCDOT)
Wando Bridge at 5:59 p.m. (Source: SCDOT) Wando Bridge at 5:59 p.m. (Source: SCDOT)
BERKELEY COUNTY, SC (WCSC) -

Traffic is getting back to normal on the Don Holt Bridge after an accident had shut down two westbound lanes Tuesday afternoon.

At 6 p.m., the Highway Patrol reported two left lanes of westbound traffic on the bridge was shut down near mile marker 21.

SCDOT cameras showed heavy traffic delays as far back as the Wando Bridge, six miles before the scene.

The Highway Patrol says there were no injuries reported in the collision.

Copyright 2014 WCSC. All rights reserved.

Powered by Frankly